Development stages of the project due:
1:200 Sectional Model
After feedback from the concept design phase, I have explored changing levels of the laboratories. I had previously changed the sea wall shape to match the design above the coal loader. So the sandstone would be deconstructed and rebuilt to the new shape. This development will be less impeding on the existing sea wall and buttresses which i want to retain.






No comments:
Post a Comment